Case File
efta-efta01107298DOJ Data Set 9OtherPunch List — May 23. 2012
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01107298
Pages
2
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Punch List — May 23. 2012
1. Five Palms — TOP PRIORITY
- Laying conduit and pulling cable — begins 5/26 -
- Exterior Door Shutters — PO rejected by JE, on hold awaiting design
- Interior Doors — Install 5/25/12
- Painting — final outside & inside coats to be completed — 5/30 and 5/31
- Furniture — Sofa — leather samples/pictures forwarded — Sarah
- Desk - on site
- Rug — on site, cleaning scheduled for 5/30
- lights— Parrots finished, awaiting approval on down lights
- Mirrored siding — Panels ordered/Sarah Glue here Tues
- tapestry Molding for Ceiling — bid rejected, need to review design with JE
- Transformer building — Building 5/31, 5/25 — final electrical hookup 6/8 — temporarily powered by generator
- Flooring — installation 5/23 to 5/26
- Fire pit — gas and grate installation 5/30
2. Grotto -
- Genset wiring — scheduling to be determined
3. Berm —4 large planter boxes with small planter inside require construction — size to be determined by JE
- cleanup and excavate — 5/26
- hydroseed — 5/29
- remove rock screener - 5/25
4. Engineering/Maintenance Yard
- Steel Shed — foundation in progress
-Metal Sheets on old building
5. Triangle - landscaping
6. Flagpole Pool Cabana -
- Recovering of sofa/chairs — work in progress
- Furniture - review another piece of furniture — Sarah
7. Entry Tree Lights— lights on site — installation complete 6/1
8. Solutions for Generators — Sound proofing solution forwarded to JE, require direction , wall built
9. Tiki - shields with the vendor in Wewak (5/4) — working on the permit to export — will take 1 to 2 weeks
10. Dock —
- Decking — replace all damaged boards and carpet — 5/31
- Floating Dock— 5/31. Ramp by 5/29
- Jet ski Docking - review
- Table/Dock Box —Bill starting 5/29
11. Kite House — review of wooden outside furniture - Sarah
12. Chillax Room — requires furniture piece for electrical/media equipment — Sarah
13. Chilax Bathroom - requires blue rugs for bathroom & vanity area — Sarah
14. Mechanical Building
- Replacement Transformer — approved to purchase — ordered
15. Boats
- Midnight Express — purchase Yamaha 300 motors, install by Offshore Marine — 2 of the 3 engines at Offshore,
awaiting last one, by 5/30 — the steering from Lewis Marine delivered 5/23
- PRD — sell — Craig to discuss with JE
EFTA01107298
- Lady G — sell
- Big N - sell
- Calypso— refurbish — Craig to discuss with JE
16. Gym Road - road grading after Five Palms — 6/1
17. Outside Master Bedroom — bedroom door adjusted — awaiting lock
18. Timers— review installing timers on air conditioners, irrigation water systems, and lights
19. Life vests — new life vests, yellow and black, in men's and women's sizes — at least 2 of each, if not 4 in
unisex size so they can be exchanged - Sarah
20. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond
and beach
21. Pergolas— construct 3 pergolas for benches at the top of the hill — start 5/29
23- Main entrance/ gravel/grade
EFTA01107299
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Wire Ref
refurbishForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.