Skip to main content
Skip to content
Case File
efta-efta01121704DOJ Data Set 9Other

Paul Ferreras, P.E. Structural Engineer

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01121704
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Paul Ferreras, P.E. Structural Engineer PO Box 600122 St. Thomas VI 00801 Name Address Gary Kerney LSJ LLC Construction 6100 Red Hook Qtr Suite A2-7 St. Thomas, USVI 00802 Estimate Date Estimate # 7/7/2011 Project Spa Building 721 x 44'-7" Little St. James St. Thomas, USVI Project Spa Building Item Description Hours Cost Total Scope of Work Engineering Engineering Out Of Pocket Using Architect Design Development Plans - Prepare Construction Documents for obtaining DPNR permits. Assist Owner with Permit Acquisition. Structural Design of Building with Details, prepare Floor Plans, Elevations, Structural, Plumbing & Electrical Plans. Plot Plan (based on survey Owner). Building Permits (assuming CM by Owner) Budget We will make revisions prior to Design & Drawings without charge. revisions after Design / Drafting will be at our standard rates. Printing, Government Fees, Express Mail etc. billed at cost Should the foregoing be acceptable, please sign, date and return to may schedule your work. Approved: Dated: by Arty us so we 1 0 0 10,000.00 150.00 1.00 10,000.00 0.00 0.00 It's a pleasure working with you! Total $10.000.00 EFTA01121704

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.