Zorro Projects - 6/15/13 Landscaping (22) - Rear Planter Bed Front & Rear Parking Beds Bowel Garden Aspen Grove Pinion Screen Start End Total Est. Cost 575,000.00 3/28/13 - Refurbishment & Maintenance proposals from 3 companies forwarded to RK & DI 4/27/13 - JE approved Aspen Landscaping for Refurbishment 5/9/13 - New proposal forwarded to JE & RK, awaiting direction 5/16/13 - Final proposal forwarded to RK, will discuss with JE 5/24/13 - Aspen agreed to $75,000 5/31/13 - $44,383.08 Deposit issued to Aspen 6/1/13 - Project Started 6/8/13 - Work continues, soil preparation in progress 6/14/13 - Plant material starting to arrive, more due next week - !attached photos Notes 6/1/13 landscape Lighting Timers Replacement - Start Landscaping - In House - Ponderosa Pines & Landscape Light:, at Front Entrance End Total Est. Cost $5,000.00 4/27/13 - JE approved 5/1/13 - Unable to move forward until Project 22 - Landscaping has been resolved 6/1/13 - Brice to review with Aspen about location etc. 6/7/13 - Awaiting electrical proposal from RMC Electric Notes Start End Total Est. Cost OS/1S Notes 4/27/13 - JE approved the removal of-dad pine in courtyard & Ponderosa Pines, Landscape Lights & relocate Pinions to the area. 6/3/13 - Project Started 6/7/13 - Removal of Ponderosa Pines complete 6/18/13 - Removal of courtyard Pine scheduled Photo X Photo Photo EFTA01124639 Zorro Projects - 6/15/13 Terraces (27) - Start End Total En. Cost Notes Photo Terraces - $52,000.00 Stucco/Gutters/Painting - $4,200.00 4/7/13 $56,200.00 12/12/12 - Bid Received 3/20/13 - JE approved 4/7/13 - Project Started 4/20/13 - Library Membrane - installed. 5/16/13 - MBR Balustrade reinstalled 5/20/13 - MBR Membrane to be installed i5/31/13 - There was a fault in one of the rolls of material, vendor has reordered, will recover area once on site. 6/7/13 - Material on site, will continue 6/10/13 6/14/13 - Membranes & Gutters Complete - attached photos 6/18/13 - Stucco & Painting scheduled to start X Photo Front Gates Openers Call Boxes (30) - Start End Total Est. Cost Notes 4/20/13 - Bid received, requested vendor to make adjustments 5/9/13 - Received revised bid. Options & Equipment reviewed 5/12/13 - Options & Equipment selected, final bid due 5/21/13 5/21/13 - Final bid received via fax, unable to read, vendor will resend. 6/8/13 - Final bid attached, also forwarded separately to RK. 6/11/13 - RK requested material breakdown 6/14/13 - Material breakdown forwarded to RK Cooling Tower - (36) Start End Total Est. Cost Notes Photo 4/24/13 - RK approved bid from SPX & JBH. RK has all cost details 5/3/13 - Deposit was to be forwarded, awaiting confirmation 6/25/13 - Unit due on site EFTA01124640 Zorro Projects - 6/15/13 Replacement of Pool Pac (33) - Start End Total Est. Cost Notes Photo Engineering Inspection - $9,100.00 Unit Cost - $43,170.00 Camera Ducting Inspection - $1,214.91 Ducting - TBA 9/11/12 4/29/13 - Quote forwarded to RK, who requested more detail 5/8/13 - Revised quote forwarded to RK, awaiting direction 5/22/13 - Beaudin Ganze on site to review project 5/29/13 - Beaudin Ganze report forwarded to JE & RK 5/29/13 - JE approved investigation via camera. 6/3/13 -JBH forwarded estimate 6/4/13 -JE approved moving ahead 6/11/13 - JBH due on site 6/12/13 - JBH on site, completed camera inspection, awaiting report Repair Pool/spa (29) - Start End Total Est. Cost Notes Photo $12,600.00 5/9/13 - Vendor on site 5/16/13 - Bid breakdown forwarded to RK IF requested work.be completed an Sept REQUIRE CONFIRMATION THAT BID IS ACCEPTED, SO VENDOR CAN BE PLACED INTO SCHEDULE Water Sample of Tap Water - Start End Total Est. Cost Notes Photo 6/12/13 4/27/13 - JE requested water samples be taken. ads will be completed once water system is balanced 5/10/13 - Dakota RO Is down, pressure issues 6/2/13 -All Wells up and running 6/12/13 - Water samples taken. Results due back 6/24/13 Exterior Doors Main House - Start End Total Est. Cost Notes Photo 4/27/13 - JE requested that all saddles on exterior doors be adjusted so doors will close correctly. Will be completed once Terraces etc. complete EFTA01124641 Zorro Projects - 6/15/13 Audio Upgrade - Start End Total Est. Cost Notes Photo New N's 6/3/13 Installed - final programming required DVD Players/Theater Upgrade Installed - Programming of remotes required 5/14/13 - Awaiting replacement receiver for Gym before moving forward 5/24/13 - Receiver on site 6/3/13 - Work to begin 6/7/13 - Work 80% complete in Gym, Breakfast Rm, Lodge & BH 6/12/13 - Gym, Lodge & BH Systems Complete 6/14/13 - Will exchange the Samsung DVD for a Marantz DVD in Breakfast Rm End Total Est. Cost Photo Kitchen Table Electrical - (35) Start Notes Electrical & Data Cut In - $2,160.00 6/3/13 6/13/13 3/1/13 - Bid received Lead Time 1 Week 6/3/13 - Project Started 6/7/13 - Under floor conduit due to be completed 6/12/13 . . . 6/13/13 - Conduit installed, tiles replaced & grouted. Cat 5 still to be pulled and punched down Start End Total Est. Cost Photo Media Room Curtains (24) - Notes & RK Blackout & Rings 2/24/13 4/27/13 - JE selected fabric 5/10/13 - Project Request forwarded to JE 5/17/13 - Resent Project Request to JE 5/31/13 - AWAITING DIRECTION $6,262.08 Sarah's Office Curtains (25) - Lined & Rings Start End Total Est. Cost 2/24/13 $2,527.01 Notes 4/27/13 - JE selected fabric 5/2/13 - Vendors/manufacturer cannot provide enough yardage of selected fabric 5/9/13 - Another fabric option forwarded to JE 5/10/13 - Project Request forwarded to JE & RK 5/17/13 - Resent Project Request to JE 5/31/13 - AWAITING DIRECTION Photo EFTA01124642 Zorro Projects - 6/15/13 Gym - Mirrored Doors - Backed/Framed Start End Total Est. Cost 1 Notes Photo 2/24/13 3/4/13 - Project Complete. JE requested further work, which will begin once Project 27 - Terraces complete Phones Main House (31) - Start End Total Est. Cost Notes Photo 4/27/13 - JE approved installation of new phones at MH Awaiting for service provision & estimated cost of delivery of services - Project 21 Microwave & IT Microwave & IT - (21)- Start End Total Est. Cost Notes Photo 4/27/13 - JE requested to investigate Microwave option 5/9/13 - Existing Microwave details forwarded to JE, RK & JR, awaiting direction 5/16/13 - JE requested contacting Dava Baumann reference delivery of service from Sandia Crest verses D Mark 5/17/13 - Dava Baumannhas forwarded detailsof RSM Craig Franck. Brice has been in contact with Craig will forward details 5/24/13 - Received bid from Southwestern Wireless, have call set up for 5/28/13 to review bid 5/31/13 - Brice forwarded an update of Project to JE, RK & JR 6/8/13 - Forwarded TW Telecom Proposal for Delivery of Services to JE & RK. Firm Bids due by 6/14/13 6/14/13 - Received bid from Southwestern Wireless, confirming details before forwarding 6/15/13 - Informed JE, will forward once all details confirmed Cell Repeaters & WI-Fl Start End Total Est. Cost Notes Photo Cell Repeater - Library Will have installed 6/21/13 Cell Repeater - Gym Will have installed 6/21/13 Computers - Start End Total St. Cost Notes Photo Lap Top - Lodge Requesting Approval to Purchase Desk Top - RC Office Requesting Approval to Purchase EFTA01124643 Zorro Projects - 6/15/13 Well K (37) - Start End Total Est. Cost Notes Photo Plugging First Hole $15,000.00 Estimate to plug 1st hole Lodge Roof Start End Total Est. Cost Notes Photo Repair/Replace Broken Sections Three B's will complete while on site for upcoming projects i Tort - (23) - Start End ! Total Est. Cost Notes Photo Replacement Walls/Roof/Door/Windows 5/9/13 $6,355.00 plus shipping charges of approx. $480.00 I _ End Total Est. Cost 4/27/13 -JE approved Investigating options 5/9/13 - Project Request forwarded to RK & A 5/9/13 -JE approved Project, awaiting direction on deposit payment from RK 5/13/13 - Deposit forwarded to vendor $3,177.50 6/24/13 - Removal of fumiture, deconstruction of existing walls/roof/windows & door to begin. Then reconstruction of base, resanding/sealing floor required - in house 7/3/13 - Scheduled Ship Date Start Repair/Painting Work - ion Notes Photo 5/7/13 - E Mailed Photos to JE showing work required 5/23/13 - Forwarded all work details to Ion, including work that will be required after MBR Terrace is completed EFTA01124644 Zorro Projects - 6/15/13 Painting/Staining/Sealing - In House Start End Total Est. Cost Notes Photo Hay Barn 5/13/13 6/14/13 5/13/13 - Project Started 5/24/13 - 90% - Staining of trim to be completed 5/30/13 - Work to start, due to high winds & stormy weather work to continue 6/10/13 6/14/13 - Project Complete - attached photo X Bunkhouse 4/14/13 6/14/13 4/14/13 - Project Started 5/3/13 - 80% - Staining of trim & deck to be completed 5/30/13 - Work to start, due to high winds & stormy weather work to continue 6/10/13 6/14/14 - Project Complete - attached photo X Bay Garages - including outside lights 5/13/13 6/14/13 5/13/13 - Project Started 5/24/13 - 90% - Staining of trim to be completed 5/30/13 - Work to start, due to high winds & stormy weather work to continue 6/10/13 6/14/13 - Project Complete - attached X photo Fire House - including outside lights 5/13/13 6/14/13 5/13/13 - Project Started 5/24/13 - 80% complete 5/30/13 - Work to begin, due to high winds & stormy weather work to continue 6/11/13 6/14/13 - Project Complete - attached photo X Stables - including outside/Inside lights 5/29/13 - Work to begin, due to high winds & stormy weather work to begin 6/17/13 Yellow House Garage 6/12/13 6/14/13 6/12/13 - Project Started 6/14/13 - Project Complete Log Cabin Work to begin once all painting/staining projects complete at RC Lodge Work to begin once all painting/staining projects complete at RC Reservoir Work be begin once all painting/staining/sealing projects complete Fuel Storage Tanks Work to begin once all painting/staining/sealing projects complete EFTA01124645 Zorro Projects - 6/15/13 RC Office Interior Work scheduled for Winter Fuel Storage Tank Area - In House Start End Total Est. Cost Notes Photo Removal of grass. Matting & edging to be installed Gravel/Edge Work RC Paths - In House Start End Total Est. Cost Notes Photo All paths to be dug out, edged and gravel to be installed Log Cabin - In House Start End Total Est. Cost Notes Photo Step Outside - Repair/Replace Broken Section Caboose - In House Start End Total Est. Cost Notes Photo Installation of Retaining Wall 4 Bay Garages - In House St S End Total Est. Cost Notes Photo Repair Leaking Roof Repair Damaged Wall Start End Total Est. Cost Pole Barn Water Truck Parking Notes Photo Installation of a Retaining Wall To begin late Fall, Early winter Start End Cactus Removal - In House Total Est. Cost Notes Photo Removal of Cactus to begin late Fall, early Winter r Vehicles Start I End Total Est. Cost Notes Photo 2013 Ford Expedition - review Captain Seats to be Installed 3/27/13 / 5/2/13 - Estimate received - $11,528.74 5/31/13 - as of date unable to get a 2nd estimate, I End t Total Est. Cost] Dogs Start Notes Photo 4/27/13 - JE approved Investigating purchase of 2 dogs. Researching EFTA01124646 Zorro Projects - 6/15/13 Inventory/dean Work Shops - In House Start End Total Est. Cost Notes Photo 6/6/13 Work continues as time allows - complete clean up & Inventory of all work shops at RC & MH Purchases Start End Total Est. Cost Notes Photo White Rug & Pad (26) - Gym (10 x 12) 5/16/13 6/14/13 $862.55 4/27/13 -JE Robert's to manufacture a rug using carpet used in M Office. Vendor no longer stocks this brand, will add 10% for spedal order. 5/15/13 - 2 Estimates received 5/16/13 - Estimate forwarded to JE - Enchantment Carpet 5/16/13 - Project approved 6/8/13 - Rug on site 6/14/13 - Project Complete - attached photo X Big Urns-Outside MH 4/27/13 -JE approved Terre Cotto constructed Urns Outside Pool Furniture 6/22/13 - Will forward possible options Pool Pace Clock 4/25/13 - Ordered, lead time 4 to 5 weeks Large Chrome Pool Clock Investigating Options Facial Machine to purchase Wells- Dakota & K Combined Usage as of date 6/14/13 6.33 afa 2014 Budget Bunkhouse Start End Total Est. Cost Notes Photo Window/Doors - Total Replacement EFTA01124647

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire RefRefurbishment
Wire Refreference

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.