Skip to main content
Skip to content
Case File
efta-efta01124755DOJ Data Set 9Other

f-urs r iv tencisdpanicin

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01124755
Pages
21
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
f-urs r iv tencisdpanicin 'aura pi - I - Rani:not MC WI t 1W I 1/ 1.3 21- MICROWAVE & START. END EST.COST Naga PHOTO STATUS ll 4/27/13 - JE requested to investigate Microwave option Awaiting 5/9/13 - Existing Microwave details forwarded to JE, RK & JR Direction 5/16/13 - JE requested contacting Dava Baumann reference on E Mall delivery of service from Sandia Crest verses D Mark dated 5/17/13 — Dava Baumann forwarded details of RSM —Craig 10/10/13 Franck. Brice has been In contct with Craig 5/24/13 — Received bid from Southwestern Wireless, have call set up for 5/28/13 to review bid 5/31/13 — Forwarded update of Project to JE, RK & JR 6/8/13 — Forwarded 1W Telecom proposal for Delivery of Service to JE & RK. Firm bids due 6/14/13 6/14/13 — Received bid from Southwestern Wireless confirming details. Informed JE, will forward once all details confirmed Approval JE 8/20/13 — JE approved Southwestern Wireless bid. RK to negotiate final bid 6/27/13 - Southwestern Wireless unable to deliver bundled T1 6/28/13 — Looking into other options 7/12/13 — Awaiting proposal from Advanced Communcations Will review proposed Link Plan with JE on site 8/14/13 — Proposal received 8/15/13 —Conference call completed with RK, BG, SD & RB 8/17/13 —Advanced Communcations on site to review Project JE 8/18/13 — Confirming Advanced Communcations require Service Provider before their can engineer final solution 8/26/13 — Filed a complaint with PRC NM regarding Century Link backing out of Service Provider option. 10 days to respond 8/27/13 — Contacted Steven Grabiel (High Speed Internet Edgewood) Expect Proposal 8/6/13. Will forward once in hand 8/29/13 — Received Proposal from RMC for x 3 40ft poles Page 1 EFTA01124755 Zorro Development Corp - Project Report 10/11/13 9/17/13 — Received Proposal from High Speed Internet. $500.00 per mth for 10 mbps plus $10000.00 to run Ethernet Cable to Tele Beeper shed on Sandia Crest Aooroval JE 9/19/13 —JE approved site vast by HugesNet 9/20/13 — Have forwarded info to HugesNet, awaiting installation date. Order #5709982. Once installation is complete & account active, final details of package will be added. 9/23/13 — Received proposal from Advanced Communcation on upgrading Router & Wireless Links to RC & Lodge 9/27/17 - Forwarded to RK & DI proposals from RMC Electric & Advanced Communcations.. Awaiting direction 9/30/13 — HugesNet due on site 10/2/13 — Postponed HugesNet until direction provided 10/10/13 — Proposal from Advanced Communcations forwarded to JE. RK is to review. Awaiting Direction Page 2 EFTA01124756 Zorro Development Corp - Project Report 10/11/13 22 - LANDSCAPING START END EST.COST y NOTES PHOTO STATUS .. • 06/01/13 $75,000.00 3/28/13— Refurbishment & Mainteance Proposals from 3 Awaltin com .•- ies forwarded to RK & DI Direction ....v.i; • 7/13 — JE ap . roved Aspen for Refurbishment Pro ect & As . - n on to remain as ZDC Mainteance Corn. = E Malls 5/9/13 New P ...- - forwarded to JE, RK awaitin direction dated 5/16/13 — Final proposal forwarded to RK 08/22/13 5/24/13 — Aspen agreed to $75,000.00 09/26113 5/31/13 — Deposit of $44,383.08 issued to Aspen 09/27/13 8/1/13—P • .: Started 6/8/13 — Work continues, soil preperation in progess 14/13 — Plant material starti . to arrive : 18/13 — More • lant materail on site • 1/13 — Back Parking Area - Planting & Irrigation Complete 6/22/13 — Planting & Irrigation continues — attached photos ; ; 13 — More material on site • 7/13 — Preperation of front parking area begins, Columbines & Trum• - Vine nted a • . • - . - between MH &D.. Pen I '. ation installed in all • lanted areas — attached ehotos 7/12/13 — Plant & Irrigation installation continues — nt schedule & os 7/26/13 — Project 90% Complete Havi issues locati Trees. /13 — JE decided not to install Cypress Trees, in lu Aspen will remove 4 old Hawthorns & replace with 4 Junipers 8/9/13 — Final Breakdown of Project forwarded to JE 8/1W13 — JE to meet Jose from Aspen to review Project 8/11/13 - JE updated request - remove old Hawthorns & Junl 8122/13 - Forwarded to JE suggested colourful plant, material selected for discussed areas - awaitin direction Page 3 EFTA01124757 corro uevelopm ent b-orp - rrotect rceport iun in .1 -7 -- 8/24/13 - Awaiting Proposals - 3 vendors for Preventive Spraying & Fertilizing of new & exisiting plant material due by 9/24/13 9/16/13 — Aspen Landscaping removed old Hawthorns & Junipers attached photos 9/22/13 —Awaiting Direction 9128/13 — Forwarded to RK 3 Proposals for Preventive Spraying & Fertilizing 9/27113 — Forwarded to JE & RK photo of proposed Blue Spruce 8 — 7 ft, larger would be available in the Spring 10/4/13 —Awaiting direction Page 4 EFTA01124758 Zorro Development Corp - Project Report 10/11/13 22A - LANDSCAPE START MR EST.COST NOTES LIGHTING 7/13 —JE Approved New Landscape Lighting 5/1/13 Unable to move forward until Project 22 — Landscaping has been resolved 1/13 — Reviewing with Aspen about plant location Page 5 7/18/13— Have installed Lighting where planting is complete 7/27/13 — Before proceeding will review with JE on site 8/22/13 — Will Complete Project once Project 22 — Landsca MH Complete STATUS Pending Completion EFTA01124759 Zorro Development Corp - Project Report 10/11/13 32B IN HOUSE - START END E$T.COST NOTES PHOTO STATUS LANDSCAPING 06/03/13 4/27/13 — JE Approved, removal of dead Pine in courtyard, Awaiting removal of Ponderosa Pines, Landscape Lighting at front Vendor Enterance & to relocate Pinons to the area to be on 6/3/13 — Project Started afte 6/18/13 —Removal of Pine & Ponderosa Pine complete - 10/12/13 attached photos 7/19/13 — Relocation/Installation of Pinons from remote areas of the Ranch to front enterance continues 7/27/13 — Project 90% complete, will review with JE while on site 8/21/13 — Reviewed area with JE, outlining scope of work 8/29/13 - Removal of dead & infected Pinions — Complete 9/18/13 — Forwarded to JE & RK estimate — hand dug & plant Pinions by Aspen Landscaping $375.00 per tree To purchase & plant locally 8ft to10ft trees $150.00 per tree Estmated number of trees, MH —12, LV —14 9/22/13 —Awaiting Direction Approval JE $5,040.00 9/24/13 — JE Approved purchase of local Pinions at $150.00 per tree, awaiting proposal due 9/30/13 9/30/13 — Received proposal, reviewing with vendor 10/2/13 — Forward Proposal to JE & RK 10/3/13 — Working with Vendor to schedule start date 10/10/13 — Approved contract withdrawn by Vendor, unable to provide enough Pinions 10/12/13 —Another local vendor will be on site to review project Page 6 EFTA01124760 Zorro Development Corp - Project Report 10/11/13 24-MEDIA ROOM CURTAINS START Q4Q EST.COST NOTES PHOTO STATUS I. Blackout & Rings $8,282.08 4r27/13 - JE Selected Fabric for Project Awaiting 5/10/13— Project Request Form forwarded to JE & RK Direction 5/17/13 — Resubmitted Project Request Form to JE 5/31/13 —As of date Awaiting Direction 25 — OFFICE START eV EST.COST NOTES BEM AIMS CURTAINS Lined & Rings $2,527.01 4/27/13 — JE Selected Fabric for Project Awaiting srrn — Vendors & Manufacturer enable to provide enough Direction yardage of selected fabric on 5/9/13 — Another fabric option forwarded to JE Forwarded 5/10/13 - Project Request Form forwarded to JE & RK E Mail 5/17/13 - Resubmitted Project Request Form to JE dated 5/31/13 - As of date Awaiting Direction 05/17/13 Page 7 EFTA01124761 Zorro Development Corp - Project Report 10/11/13 27 - TERRACES START , END EST.COST NOTES 'PHOTO STATUS Terraces - $52,000.00 04/07/13 $56,200.00 12/12/12 — Bid received. Awaiting Proposal Stucco/Gutters/Painting 3/20/13 -JE Approved Bid $4,200.00 4/7/13 - Project Started from 4/20/13 — Libary Membrane installed 3 El's 5/10/13 — Change Order Submitted by Vendor $2,700.00 + tax 5/16/13 — MBR Balustrade reinstalled 5/20/13 — MBR Membrane to be installed 5/31/13 — A fault in 1 roll of material, vendor has reordered 6/14/13 — Membranes & Gutters Complete — attached photos 6/21/13 — Stucco & Painting Complete — attached photos 6/24/13 — Final review on completed work with Vendor 72/13 — Final Punch Out to begin of all outstandirs work 7/3/13 — Project Complete on Telescope Terrace 8/8/13 — JE requested carpet to be installed on both terraces Carpet -$2,078.15 8/17/13 — JE selected carpet, 1 selection on back order 8/19/13 — 3 B's to meet with JE to review Project 9/3/13 — 3 B's on site to Water Test MBR Terrace 9/17/13 — Carpet on site, will be installed prior to next visit unless given other direction 9/18/13 — Forwarded E Mail to JE & RK showing gutter Issue 9/24/13 —3 B's on site, sealed existing gutter cap & water tested leaders. 9/27/13 — Forwarded E Mail to JE & RK noting_prexisting issue, separate to the leak on the Princess Deck ceiling Chance Order $460.00 10/9/13 —Change Order E Mailed to RK via 3B's PVC elbow connected to gutter spout, therefore backup water causing overflow in metal moulding & fasia of terrace Leaders sealed correctly, terrace & gutter flooded with water - no leaking from ceiling Water sprayed on wall below windows — leaking occurred, 3 B's 'temporarily sealed area. 3 B's recommend cutting section of stucco & flash area correctly 10/4/13 — 3 la's Proposal to be forwarded Page 8 EFTA01124762 Zorro Development Corp - Project Report 10/11/13 29 - REPAIR ef2QUEEA START fQ EST.COST NOTES PHOTO STATUS 5/9/13 — Vendor on site 5/16/13 — Bid breakdown forwarded to RK 6/10/13 — JE requested that work be started in Sept 2013 8/20/13 — JE requested that 3 S's submit a bid for Project 9/3/13 — 3 El's on site to review Project 9/24/13 — 3 Be declined moving forward with Project 9/24/13 — JE approved moving forward with replastering of Pool &Cleaning Spa tile 9/27/13 — Forwarded Proposal to RK from Lee Sure Pools Awaiting Direction 10/4/13 — RK will be contacting Lee Sure Pools in reference to their proposal 10/9/13 — RK requested another vendor proposal 10/11/13 — As of date still hying to locate another vendor who can complete this work, will continue to investigate options Page 9 EFTA01124763 Zorro Development Corp - Project Report 10/11/13 30- FRONT GATE START ' END EST.COST NOTES PHOTO STATUS OPENERS Cell Boxes/Loops 07125/13 $10,833.00 4/20/13 — Bid received, requested vendor to make adjustments Awaiting 519/13 — Received Revised bid. Options & Equipment reviewed Installation 5/12/13 — Options & Equipment selected Gate Loops 5/21/13 — Final bid faxed, unreadable, vendor will resend 10/15/13 6/8/13 — Final bid from RMC Electric - $11,941.00 6/11/13 — RK requested material breakdown '6/14/13 — Material breakdown forwarded to RK 6/19/13 — RMC Electric resubmitted revised pricing to RK 6/28/13 — RK requested that 3 B's submit an estimate. Have contacted 3 B's, they will be on site next week to review 6/29/13 — Forwarded E Mail to 3B's outlining scope of work to be included within the bid 7/9/13 — RK neogiated 3 B's bid 4kopro = IRK 7/11/13 — 3 B's Bid Approved. 7/12/13 — Forwarded Deposit Request $6,750.00 to BK & RK 7/12/13 - 3B's received Deposit 7/25/13 — Project Started 7/27/13 — Gate 1 Controllers & Key Pad installed. New Key Pad for Gate 2 faulty, vendor has reordered — attached photos 8/10/13 — Waiting for installation of loops & Gate 2 Key Pad 8/19/13 — Vendor to meet JE 8/21/13 — Gate 2 Key Pad installed, gate phone lines down, hence no remote control to operate gates 8/30/13 — Contacted RMC regarding phones & gate controllers will be on site next week 9/2/13 — As of date Gate Looms Not Installed 9/3/13 — 3 B's on site to review Project 9/16/13 — The bid that 3 B's neogiated with RK did not include the purchase or installation of gate loops, which was on the orginal bid submitted by RMC Electric & E Mail submitted to 3 B's by BG change Order $481.50 9/17/13 — Change Order submitted from 3 B's \9/18/13 — Submitted Change Order to JE & RK Page 10 EFTA01124764 Approval JE Zorro Development Corp - Project Report 10/11/13 9/18/13 — JE Approved Change Order 9/21/13— Awaitinadeliveli of Gate Loops to Vendor 10/2/13 —Gate Loops on Back Order, awaiting delivery to Vendor 10/16/13 — Gate Loops due to be installed Page 11 EFTA01124765 corro uevelopment Corp - rroject neport iwilita 31- PHONES MAIN START END EST.COST NOTES PHOTO STATUS HOUSE 07/17/13 10/07/13 4/27/13 —JE approved installation of new phones at MH Complete Awaiting for Service Provision & Estimated Cost of Delivery of Services from Proj 21 - Microwave & IT before moving forward 6/22/13 —Awaiting response from Southwestern Wireless on FCC License Application & Router at MH 7/17/13 — Project Started 7/25/13 - Switch & 16 Phones Installed, awaiting delivery date remainder of phones — attached photos 9/6/13 — Phones due to be deliveried to Vendor 9/15/13 — Delivery of phones to vendor have been delayed 9/30/13 — Phones due to be deliveried to Vendor 10/2/13 — Vendor on site to start installing/punching down phones 10/3/13 — Vendor had an emergency, will be on site 10/7/13 to complete Stall 10/7/13 — Installation of all telephones complete except for Princess Deck, 1 set of Cables unusable, will review other control box when next on site 32 - PHONES RANCH START op EST.COST NOTES PHOTO STATUS ONIBAL 6/21/13 — Will forward proposal for Phone System by 6/28/13 Project 6/27/13 - Project On Hold until Microwave Solution resolved On Hold Page 12 EFTA01124766 Zorro Development Corp- Protect Report 10/11/13 33 - POOL PAC START END E$T.COST NOTES PHOTO STATUS Engineering Inspection 4/29/13 — Quote forwarded to RK, who requested more detail $9,100.00 5/8/13 — Revised quote forwarded to RK, awaiting direction Unit Cost 5/22/13 — Beaudin Ganze on site to review Project $43,170.00 5/29/13— Beaudin Ganze report forwarded to JE 8 RK Approval JE 5/29/13 — JE Approved invesigation via camera 6/3/13 — JBH forwarded estimate Approval JE 6/4/13 — JE Approved moving ahead Camera Duct Inspection 6/11/13 — JBH due on site $1,214.91 6/12/13 — JBH on site, complete camera inspection, awaiting Report/Disc 6/21/13 — Report/Disc forwarded to Beaudin Ganze 7/8/13 — Report/Disc due on site 7/9/13 — Informed that Report has been delayed RK forwarded Report to JE 7/20/13 — Beaudin Ganze on site to review Project with JE JE did not approve any design solutions by Beaudin Ganze 8/22/13 — Contacted Dessert Air & fomented info regarding existing space & equipment design 9/18/13 - Site visit expected by Dessert Air to confirm their proposed solution 9/19/13 — Dessert Air have rescheduled for 9/27/13 6dsroval E 9/24/13 —JE approved investigating purchase of new Pool Pac 9/25/13 — Dessert Air pending visit — placed on hold 9/30/13 — Trane Pool Pac Rep on site 10/1/13 — Trane forwarded all info to Pool Pat 10/3/13 — Forwarded Meth Drawings of area to Trane 10/8/13 —Trane due to be on site to confirm air flow details 10/8/13 — Trane on site 10/11/13 — Trane on site to confirm auditory heating operation Page 13 EFTA01124767 Zorro Development Corp - Project Report 10/11/13 10/11/13 — Trane Proposal forwarded to RS & MT. Suggested 1-system is different from exisiting - automated outside air Dampers & circulating pump on loop water Awaiting estimate from Trane for cleaning and or replacement of ex heating coil. Due 10/15/13 Page 14 EFTA01124768 corro ueveuopment Corp - rroject Kepon itirliiiz 34- REPAIR & PAINT START END EST.COST NOTES PHOTO STATUS WORK - ION 5/7/13 — E Mailed Photos to JE showing work required Awaiting Direction 5/23/13 — Forwarded all work details to Ion, including work that will be required after MBR Terrace Is completed 6/29/13 — Additional work — Sign on Adobe,OIEFfice Wall 6/30/13 — As of date Awaiting Direction ILthSTILII START END EST.COST NOTES PHOTO STATUS Plu_ggirIg_1" Hole $15,000.00 Estimate to Plug 1 st Hole REFURBISHMENT START END EST.COST NOTES PHOTO STATUS (ROADS CULVERTS 7/27/13 — Will review with JE on site, of at Roads &Culverts 8/5/13 — Road Base 23 tons $360, Culvert 4ft x 24ft - $1,381.85 Culvert 5ft x 24ft - $1,727.24 9/27/13 — Due to high water flow/rain, culvert gone from under, road, no access to North Gate Road, past the Caboose attached photos 9/30/13 — Work begins to return culvert to correct position, pack with gravel 8 dirt, reconstruct road 10/1/13 - Culvert back in place, road passable - attached photos 40 - LANDSCAPING START 2112 EST.COST NOTES PH= SIAM LOG & LODGE 10/08/13 10/8/13 — Removal of dead trees, prunning trees started 10/11/13 — All dead trees have been removed from back of Lodge. All trees surrounding the Lodge have been pruned - attached photos Work will continue after guests leave 10/21/13 Page 15 EFTA01124769 Zorro Development Corp - Project Report 10/11/13 41- REFURBISHMENT HOME THEATER START END EST,COST _NOTES PHOTO STATUS 8/13/13 — JE requested replacement of existing Sony Projector Awaiting Revised 8/15/13- 3 Vendors on site - Proposals due next week 8/22/13 - JE forwarded 2 Proposals Bids 8/25/13 — Received 3n0 Proposal JE requested Purchase of Projector to be placed On Hold as new projector to be released Dec 2013 Aooroval JE $83.06 9/17/13 — JE approved purchase of HDMI Cable $320.00 + tax 9/17/13 — JE approved 3 B's installation of HDMI Cable 9/18/13 — HDMI Cable ordered 9/28/13 — HDMI Cable on site 9/30/13 — HDMI Cable installation begins 9/2/13 — HDMI Cable installed 10/3/13 - New Model of Sony Projector will start to be shipped end of Oct. Forwarded E Mail to JE & RK with details, awaiting direction 10/10/13 — Vendors to provide revised bids with new e ._____ and screen. 10/11/13 — Awaiting revised bids Page 16 EFTA01124770 tiar REFURBISHMENT corro ueveiopment Corp rropect neport iun 1/13 START QM EST.COST NOTES PHOTO STATUS HOUSE EXTERIOR - ILA 09124/13 $10,807.00 8/22113 —JE Approved Project X Awaiting Direction 3 B's to complete MH. ZDC to complete Garage (Project 42A) 9/3/13 — Requested RK & BK for Deposit of $7,500.00 9/4/13 — Deposit received by 3 B's 9/24/13 — Project Started 9/27/13 — Work continues — attached photos 10/2/13 — Stucco complete, vendor working on color sample 10/4/13 — Work continues attached photos JJ has recommended that we use a synthetic stucco, forwarded this information to JE. Extra expense of $2,000 $52.09 _10/9/13 - ZDC have removed front door for strigag & painting. Plywood cover installed to replace door area 10/10/13 —ZDC has completed all priming of posts & eaves — attached photos 10/11/13 — Awaiting direction on Stucco Finish/Color 4.2..&- START am EBT.COST NOTES PHOTO ITEM REFURBISHMENT GARAGE EXTERIOR - LY. 09/30/13 $1,543.26 9/30/13 — Project Started Awaiting 10/2/13 — All garage walls have been primed Direction 10/3/13 — Priming of all trim on Garage & House started 10/1013 — Priming of all trim complete 10/11/13 — awaiting Direction on Stucco Finish/Color for MH Page 17 EFTA01124771 Zorro Development Corp - Project Report 10/11/13 43 - REFURBISHMENT START END EST.COST T NOTES ni4I4 STATUS LANDSCAPING — LV 8122/13 — JE Approved Project Awaiting Cover Rock with soil, Pinion installation Direction 8/22/13 — Forwarded JE suggested colourful plant material on E Mall for discussed areas — awaiting direction dated 9/18/13 — Router Tilling Complete. Ready for Top Soil 10/02/13 9/18/13 — Forwarded JE & RK breakdown of installation/purchase etc of sod. Total $5,512.50 9/18/13 — JE asked how much sod. 5,350 sq ft 9/27/13 — Reviewing sod estimates 10/2/13 — Resubmitted revised Installation/purchase etc of sod to RK. Total $5,358.25 44 - LODGE ROOF START Q MOIL Nom en= STATUE 9/27/13 — Forwarded JE & RK estimate to repair Lodge Roof attached estimate & photos 9/27/13 — JE Did Not Approve Project Page 18 EFTA01124772 Zorro Development Corp - Project Report 10/11/13 PURCHASES START END EST.COST NOTES PHOTQ STATUS REPAIRS Heavy Machinery 8/22/13 — JE requested investigating a Bulldozer purchase & any other equipment ZDC may require Awaiting Direction 8/27/13 — Investigating avaiable equipment on E Mall Bobcat 9/3/13 — Investigating trading exisiting Bobcat for new dated 9/18/13 — Have price from local Bobcat dealer, as of date no one 10/02/13 has been able to match this price 1012/13 — Forwarded E Mall to JE & RK, with details Offered 8K from local contractor, $5,500 as a trade from From Bobcat. Awaiting Direction 1984 Dump Truck 9/22/13 —1989 Dump Truck requires new transmission & dutch Awaiting Direction 9/27/13 — Dump Truck was hauled, estimate expected 10/4/13 10/3/13 - Vendor did not receive message about estimate on E Mall hence ordered a rebuilt transmission $4,136.98 dated Total estimate to repair $7,712.72 10/03/13 Forwarded details to JE & RK, awaiting direction Outside Furniture - Lodge 8/22/13 — JE agreed new outside furniture required, will relocate exiitng table & benches from Shooting Range to uncovered back deck 9/1/13 — Will investigate funiture options for covered back deck On Hold 9/16/13 —After reviewing_unoovered deck, we believe that the until deck WV not handle the weight of the table & benches from the Spring 2014 La _ hooti Ra , especially nob if we receive snow 9/22/13 — Will investiage all options over the next week 9/27/13 — Will forward suggestions 10/4/13 10/4/13 — Unable to find anything locally, so late in the season. Will relocate funiture from other areas to cover up coming guest visit. Will place this project On Hold until Spring 2014 Page 19 EFTA01124773 Zorro Development Corp - Project Report 10/11/13 ZDC IN HOUSE WORK 91MUMMAEM EST.COST ELM STATUS To begin Late Fall YURT FURNITURE START NR MOM ROTES 11/=_—_ STATUS ____ ___ 8/22/13 — JE Approved reconstruction of exisitng furniture to make items more resilient to mice attack 8/19/13 —Old fabric backing has been removed from sofa/chairs FUEL EMI EST.COST NOTES PtI.4.14 STATUS 8/18/13 - Additional New Tank Installed Repainting of tanks, matting & gravel installation to begin in the Fall GRAVELJEDGES RC START am gsr.cosT NOTES PHOTO STATUS MINI All paths to be dug out, edged and gravel Installed to begin early Summer 2014 LOG CABIN STEPS HMI OISS11171 STATUS New Section to be refabricated CATTLE GATES & START ENg EST.COST NOTES PHOTO STATUS GUARDS X 3 Refurbishment, Empty & Paint SHED AT SHOOTING START alp gsr.cosT NOTES PHOTO STATUS RANGE $51.57 Repair Damaged Roof 9/30/13 — Purchased Material for Repair Page 20 EFTA01124774 corro ueveiopment t;orp - rroject tteport lull Ill J PAINTING/STAINING/ m START DIO f ST.COST NOTES PHOTO STATUS SEALING Reservior Repainting to be completed over the Fall RC Mech Bays Painting to be completed over the Winter MH Mech bays Painting to be completed over the Winter Firehouse Interior Painting to be completed over the Winter Adobe Repainting of all stucco to begin early Summer 2014 Adobe, Log & Lodge Resealing of outside & decK refurbishment to begin early Summer 2014 WELLS_ DAKOTA & K Combined Usage As of 10/10/13 17.3 afa 10/18/13 - Will file Extension of Time with OSE Page 21 EFTA01124775

Technical Artifacts (6)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone5709982
Wire RefREFURBISHMENT
Wire RefRefurbishment
Wire Refrefabricated
Wire Refreference
Wire Refrefurbishment

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.