Skip to main content
Skip to content
Case File
efta-efta01124776DOJ Data Set 9Other

Zorro Projects - 5/17/13

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01124776
Pages
6
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Zorro Projects - 5/17/13 Main House - Outside Landscaping (22) - Rear Planter Bed Front & Rear Parking Beds Bowel Garden Aspen Grove Pinion Screen rt End Total Est. Cost I Notes Landscape Lighting Timers Replacement - Landscaping - In House - Ponderosa Pines & Landscape Lights at Front Entrance Terraces (271 - Terraces - $52,000.00 Stucco/Gutters/Painting - $4,200.00 4/7/13 Estancia Fountain - 3/28/13 - Refurbishment & Maintenance proposals from 3 companies forwarded to RK & DI 4/27/13 - JE approved Aspen Landscaping for Refurbishment 5/9/13 - New proposal forwarded to JE & RK, awaiting direction 5/16/13 - Final proposal forwarded to RK, who will discuss with JE Photo $5,000.00 4/27/13 - JE approved *Unable to move forward with this project, until Project 22 - Landscaping has been resolved* $56,200.00 4/27/13 - JE approved the removal of existing Ponderosa Pines, Landscape Lights & to relocate Pinions to the area. Removal of Dead Pine in Front Courtyard. *CAN WE PROCEED WITH REMOVAL* 12/12/12 - Bid Received 3/20/13 - JE approved 4/20/13 - Library Membrane - installed. 5/16/13 - MBR Balustrade reinstalled 5/20/13 - MBR Membrane to be installed 6/3/13 - Project completion expected X 3/1/13 - Bid received - $2,500.00 4/27/13 -JE approved 4/29/13 - Brice determined that the leak is the main line going to the upper bowl. Proposed repair is to isolate leaking line & use return line to lower bowl, splitting line to feed upper bowl. This will mean we will continue using existing pump & filter. $430.00 5/20/13 - Work to start EFTA01124776 Zorro Projects - 5/17/13 Chess Fountain Repair - $1,510.00 4/27/13 - JE approved 5/20/13 - Work to start Ranch Front Gates Openers Call Boxes (30) 4/20/13 - Bid received, have requested vendor to make adjustments 5/9/13 - Received revised bid. Options & Equipment reviewed 5/12/13 - Options & Equipment selected, final bid due 5/19/13 Main House - Inside Start End Total Est. Cost Notes Cooling Tower - 4/24/13 - RK approved bid from SPX & JBH. RK has all cost details 5/3/13 - Deposit was to be forwarded, awaiting confirmation 5/22/13 - Beaudin Ganze on site for installation 4/29/13 - Quote forwarded to RK, who requested more detail 5/8/13 - Revised quote forwarded to RK, awaiting direction Replacement of Pool Pac (33) - 9/11/12 Engineering Inspection - $9,100.00 Unit Cost - $43,170.00 Ducting - TBA Repair Pool/Spa (29) - $12,600.00 5/9/13 - Vendor on site 5/16/13 - Bid breakdown forwarded to RK Water Sample of Tap Water - 4/27/13 - JE requested water samples be taken. This will be completed once water system is balanced 5/10/13 - Dakota RO is down, pressure issues 5/26/13 - Water samples to be taken Exterior Doors - 4/27/13 - JE requested that all saddles on exterior doors be adjusted so doors will close correctly. Will be completed once Terraces etc. complete Photo EFTA01124777 Zorro Projects - 5/17/13 Audio Upgrade - Installed - final programming required Installed - Programming of remotes required 5/14/13 - Awaiting replacement receiver for Gym before moving iforward New TV's DVD Players/Theater Upgrade Kitchen Table Electrical - p3/1/13 - Bid received Lead Time 1 Week Need to review design and floor Electrical & Data Cut In - $2,160.00 Media Room (24) - Curtains/Blackout/Rings 2/24/13 4/27/13 - JE selected fabric 5/10/13 - Project Request forwarded to JE & RK $6,262.08 5/17/13 - Resent Project Request to JE Sarah's Office (25) - Curtains/Lined/Rings , 2/24/13 4/27/13 - JE selected fabric 5/2/13 - Vendors/manufacturer cannot provide enough yardage of selected fabric IS/9/13 - Another fabric option forwarded to JE 5/10/13 - Project Request forwarded to JE & RK $2,527.01 5/17/13 - Resent Project Request to JE Gym - Mirrored Doors - Backed/Framed 2/24/13 Start End Total Est. Cost 3 B's completed, JE requested further work, will review with vendor Phones Main House (31)- Notes Photo $34,295.00 4/27/13 - JE approved installation of new phones at MH 5/14/13 - Awaiting engineered solution for delivery of services (phone/data) before proceeding EFTA01124778 Zorro Projects - 5/17/13 Microwave & IT (211 Start End Total Est. Cost Notes Photo 4/27/13 - JE requested to Investigate Microwave option 5/9/13 - Existing Microwave details forwarded to JE, RK & JR, awaiting direction 5/16/13 - JE requested contacting Dava Baumann reference delivery of service from Sandia Crest verses D Mark 5/17/13 - Dava Baumannhas forwarded details of RSM Craig Franck. Brice has been in contact with Craig and will forward details ASAP Start End Total Est. Cost Cell Repeaters & Wi-Fi Notes Photo Cell Repeater - Library Will have installed by 5/17/13 Cell Repeater - Gym Will be completed with Audio install Computers - Start End Total Est. Cost Notes Photo Lap Top - Lodge Requesting Approval to Purchase Desk Top - RC Office Requesting Approval to Purchase Well K PO) - Start End Total Est. Cost Notes Photo Plugging First Hole Multi Media Filters & Install Mis Pipe & Fittings 4/27/13 $15,000.00 $5,844.57 $1,000.00 4/27/13 -JE approved 5/3/13 - Multi Media Filters ordered, installation 5/20/13 5/17/17 - Pipe & Fitting due on site Dakota RO Water Softener- Start End Total Est. Cost Notes Photo 2/18/13 5/3/13 $3,045.45 5/3/13 - Complete - Well & RO on line 5/10/13 - Dakota RO off Line, pressure issues - recalibration due 5/20/13 Lo ,iglq start End Total Est. Cost Notes Photo Roof - Repair/Replace Broken Sections Total Est. Cost Three B's will complete while on site for upcoming projects Loa Cabin Start End Notes Photo Step Outside - Repair/Replace 2/24/13 NA EFTA01124779 Zorro Projects - 5/17/13 Caboose Start End Total Est. Cost Notes Photo Outside Wall - Installation of Retaining Wall NA Yurt 23 - Start End Total Est. Cost Notes photo Yurt - Replace Walls/Roof/Door/Windows 5/9/13 $6,355.00 plus shipping charges of approx. $480.00 4/27/13 -JE approved investigating options 5/9/13 - Project Request forwarded to RK & JE 5/9/13 - JE approved Project, awaiting direction on deposit payment from RK 5/13/13 - Deposit forwarded to vendor $3,177.50 7/3/13 - Scheduled Ship Date Refurbishment Yards/Grass Areas RC (32) - Start ES Total Est. Cost Notes Photo Due to poor preperation & selection of soil in 2012 all yards/grass areas need to be refurbished 5/16/13 5/16/13 - Tilling & Manure/Soil installation started in Red & Yellow yards X Painting/Staining - Start f Total Est. Cost Notes Photo Greenhouse 5/9/13 5/16/13 Complete X Hay Barn 5/13/13 90%- staining of trim to be completed X Bunkhouse 4/14/13 80%- staining of trim & deck to be completed X Bay Garages 5/13/13 90%- staining of trim to be completed X Walls/Fences/Gates/Grey Edging - MH 5/3/13 5/13/13 Complete X Fire House - including outside lights 5/17/13 5/17/13 - Work started Stables 5/29/13 - Work to begin Reservoir work to begin once all painting projects complete EFTA01124780 Zorro Projects - 5/17/13 Bunkhouse Start End Total Est. Cost Notes Window/Doors - Total Replacement 2/6/12 Will Budget for 2014 Vehicles Start End Total Est. Cost Notes 2013 Ford Expedition - review Captain Seats to be Installed 3/27/13 5/2/13 - Estimate received - $11,528.74 Awaiting 2nd estimate ft a Start End Total Est. Cost Notes 4/27/13 - JE approved Investigating purchase of 2 dogs. Researching Purchases Start End Total Est. Cost White Rug (26) - Gym (10 x 12) 4/27/13 $862.55 4/27/13 - JE approved Robert's to manufacture a rug using carpet used in Office. Vendor no longer stocks this brand, will add 10% for special order. 5/15/13 - 2 Estimates received 5/16/13 - Estimate forwarded to JE - Enchantment Carpet 5/16/13 - Project approved Big Urns - Outside MH 4/27/13 -JE approved Terre Cotto constructed Urns Outside Pool Furniture Pool Pace Clock 4/25/13 - Ordered, lead time 4 W 5 weeks Large Chrome Pool Clock Investigatin Options Facial Machine to purchase EFTA01124781

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire RefRefurbishment
Wire Refreference
Wire Refrefurbished

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.