Skip to main content
Skip to content
Case File
efta-efta01124810DOJ Data Set 9Other

Zorro Development Corp

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01124810
Pages
3
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Zorro Development Corp Landscaping: Approval that Aspen Landscaping have the contract to refurbish, need to revise scope of work - to be forwarded by the end of the week. Approval to remove Pondrosa Pines & existing landscape lights from Main House gate area - in house project Relocate more Pinions to this area - in house project Approval to remove dead pine in front courtyard - in house project Approval to add Cypress trees to front parking area Need to source Evergreen trees for rear lavender beds Bench Seat to be placed in front of Chess Set Fountain Approved replacement of the landscape timers Estancia Fountain: Approved to move ahead with Bowl Lift, Electrical & Pump - $2,500.00 Chess Fountain: Approved to move ahead with resurfacing will forward estimate by the end of the week Ranch Front Gates: Approval for the installation of new Gate Openers, reviewing estimate and will forward EFTA01124810 Sarah's Office Curtains: Approved fabric - Golden Coin #23233 Will forward an estimate on Fabric and Fabrication by the end of the week Media Room Curtains: Approved fabric - Blue Haze #32250 Will forward an estimate on Fabric & Fabrication by the end of the week Gym Mirrored Doors: Protective rubber strip to be added to bottom of doors Main House Exterior Door: All need to be adjusted Gym Rug: Contact local carpet supply. Using same wool carpet in office have a section cut and bound in the required size Will forward estimate as soon as possible Pool & Spa: Approval to move forward with obtain estimates to resurface pool & possible tile bands Pool Clock: Purchase a large pool clock - will forward suggestions as soon as possible Facial Machine: To be purchased in NYC with input from Karyna &E EFTA01124811 IT & Phones: Approval to move ahead with phones system in Main House Approval to move ahead with Microwave solution, will forward as soon as possible Well K: Approval to install transponder and muliti media filters, will forward estimate by the end of the week Water Samples: Requested water samples taken from the tap - Main House (2 locations) & Bunkhouse. Ford Expedition: Approval to replace bench seat with 2 Captains Chairs Yurt: Approval to move ahead with replacements of walls/roof/windows - estimate $10,240 Will confirm this price with the vendor this week and forward Painting: Overall painting to continue now weather has improved EFTA01124812

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire Refrefurbish

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.