From: Cecile de Jongh
To: Jeffrey Epstein <[email protected]>
Subject: 14: fiber project
Date: Tuc, 08 Dec 2015 17:58:13 4.0000
Milne-Images: image001.jpg
With warm regards.
Cecile
On Thursday. December 3.2015 7:19 PM. Hector Cintron
wrote:
When I left the office I asked Allan and I didn't see the cables. he will be looking into it.
Also just an FYI I logged in the dragonwave to gather some information and I noticed that both Ethernet ports (data and management) on the LSJ side are plugged in to the switch creating a network
loop . What I did was shutdown the management port on outside. This will help some but will be fixed tomorrow. I would not be surprised that accessing the internal is smoother now due to lowering
of the packet drops and max times
Pings before shuting down the port
Success rate is 98 percent (9876/10063). round-trip madavgimax =1141128 ms
After
Success rate is 99 percent (9999/10000). round-trip madavgimax =114144 ms
From: Jermame Rutin imailto
Sent: Thursday. December 03.2015 17:21
To: Hector Cintron
Cc: Omar Welch: Cecile de Jongh:Alyster Edwards
Subject: Re: fiber project
Email received from outside of the ATN domain. Use caution before using links/attachments.
Hi Hector
Terrence stated that the loge for dragonwaves are set to factory default .
Regards
Jruan
Sent from my Phone
On Dec 3. 2015. at 3:52 PM. Hector Cintron
wrote:
Hi Jermaine.
I just spoke with omar and the cable hasn't arrived. what we can do is this. I'll split the work on two
circuit is ready and I'll do the installation. I'll bring up the router and install the 2 switches to be able
ViNGN is up.
There will be a downtime of between 1 to 2 hours as I make the changes. If this is acceptable I'm a
once this is done I can start with the verification of the link (no changes will be made).
On the second trip I'll go to the island with Alyster takedown the dragonwave to do the following:
Test ViNGN circuit
Test ViNGN (allover
Verify all grounding
Verify al connectors weatherproofing
Verify Lightning arrestors
Check all cables and replace cables if needed
Upgrade firmware on DW if needed
Make configuration changes to the DW if needed
Let me know if this is acceptable.
From: Jemmine
Sent: Wednesday. December 02. 2015 16:31
To: Omar Welch
Cc: tense de Jonah': Alyster Edwards: Hector Cintron
Subject: RE: fiber project
Email received from outside of the ATN domain. Use caubon before using links/attachments.
Good Evening Omar ,
trips. I'll go tomorrow weather permitting (it's supposed to be sunny) regardless if the ViNGN
to monitor the dragonwave and I'll leave the deep inspection and testing for the second trip once
GO for tomorrow. What I'll need after the switch installation is the logins for the dragonwave so
EFTA01139440
I am following up to verify that VINGN is on target for tomorrow and Choice for Friday.
Regards
Jruan
From: Hector Cintrcri
Sent: Monday. November 30.2015 5:11 PM
To: Jermaine Roan
Cc: Cecile de Jongh: Omar Welch: Myster Edwards
Subject RE: fiber project
Perfect. you got everything. The PDF only had the fiber from Power and Tel and not the items from curvature. so I just wanted to make sure.
Thanks
From: Jermaine Roan Wags
Sent: Monday. November 30.2015 17:03
To: Hector Contron
Cc: Cecile de Jongh: Omar Welch: Myster Edwards
Subject Re: fiber project
Email (stewed from outside of the ATN domain. Use caution before using links/attachments.
Good day Hector
I have 2 simplex and 3 duplex cables from power and tel. I have 1 hwic module and 1 glc connector.
.)maget.JPG
Sent from my 'Phone
On Nov 30. 2015. at 4:31 PM. Hector Orton •:
:• wrote:
Those are the fiber cable from power and lei, was an order placed for the culvature items?
Bellow I highlighted the items:
Green are the items from Power and Tel that arrived
Yellow are the items from Cutvature That I do not see listed on the PDF
From: Jarman. fmadlo
Sent: Monday. November 30. 2015 16:24
To: Hector Gnaw: 'Cecile de Jongh'
Cc: Omar Welch: /Water Edwards
Subject: RE: fiber project
Erriag received from outside of the ATN Boman. Use caution before using links/attachments.
Please see attached
From: Hector Cintron
Sent: Monday. November 30. 2015 12:54 PM
To: Cecile de Jongh
Cc: Omar Welch: Jermaine: Ayala Edwards
Subject: RE: frier project
mailto
Jermaine.
Can you send me a list of all the items that you received? I want to make sure we have everything. I just created a BOM to keep track of what is needed and I'm sure I'll adding to the
work/pending list
BOM
EFTA01139441
QTY
part
desc
Installed
Location
arrived
Responsibility
1 CISCO2921/K9
Cisco Router
Data Room
Installed
Choice
1 GLC-BX-D
ViNGN Simplex Single Mode Module
In the cisco router
Data Room
LSJ
1
Between Cisco Router and Patch Panel (coming from STT)
Data Room
LSJ
1 HVVIC-1 GE-SFP
WIC Card fa SFP
Cisco Router
Data Room
LSJ
1
Between Cisco Router and Patch Panel
Data Room
LSJ
1 GLC-SX-MM
MM Fiber Module
Cisco Router
Data Room
x
Choice
1 GLC-SX-MM
MM Fiber Module
Cisco 3560
Building - Gym
x
Choice
1
Between Cisco 3560 and patch Panel
Building - Gym
LSJ
4
rackmount screws
for Cisco 3560
Building - Gym
LSJ
1 3560G-24
Cisco 3560
Building - Gym
x
Choice
1 3560G-24
Cisco 3560
Outside Cabinet
x
Choice
4
radcmount screws
for Cisco 3560 Could use existing from nelgear
Outside Cabinet
LSJ
Other Pending Items/Work
Cross Connect
STT Beach
ViNGN
Router Config Info
X
LSJ
Dragonwave Warrantee Info
??
Dragonwave Survey
Includes Signal. Firmware. Hardware. Monitoring. Grounding
Choice
From: Cede de Jongh mane
Sent: Wednesday. November 25. 2015 13:44
To: Hector Cintron
Cc: Omar Weldt JermaIne
Subject: Re: freer project
Email received from outside of the ATN domain. Use caution before using links/attachments.
Thank you Hector.
On Nov 25. 2015. at 11:37 AM. Hector Cintron
wrote:
I can only comment about N3
3 - it should. this way I can do a fill integration of the ViNGN. Dragonwave backup. test failover.
The plan that I would like to do:
•
install VINGN via the new router. Test it and switch the island over this new connection (primary)
•
Once this is done I can takedown the Dragonwave connection to add some switches to be able to monitor the link and take over maintenance. Once this is complete
•
Reconnect the Dragonwave as secondary link
•
Test failover to Secondary (DW).
The above plan has a 1-2 min downtime.
If ViNGN is not ready I can still do the install but I need to install the switches needed to monitor the dragonwave there will be a downtime of a few hours as I do the swap but no testing will be
done.
Hector.
From: Cede de Jongh
Sent: Wednesday. November 25. 2015 10:40
To: Hector Gnaw
Cc: Omar Welch: Jermaine
Subject: Re: flier pro;ect
Email received from outside of the ATN domain. Use caution before using links/attachments.
Ok.
1. Does this still need to be scheduled with them?
2. If so. do we do that or do you?
3. Does this need to be done before Hector goes to the island or can it be done anytime afterwards?
On Nov 25. 2015. at 10:19 MA. Hector Cintron .‘-
> wrote:
The crossover does require a visit to the Pole (the one in St Thomas at the beach) where ViNGN connects to the fiber the goes to the Island.
From: Cede de Jongh
Sent: Wednesday. November 25.201510:17
To: Omar Welch
Cc: Jermaine: Hector Canton
Subject: Re: freer pitied
Email received from outside of the ATN domain. Use caution before using links/attachments.
Does this "crossover" require VINGN to visit the site or is it something that is done remotely from their office?
On Nov 25. 2015. at 10:01 MA. Omar Welch <
> wrote:
EFTA01139442
Hi Cecile
The connection does play a part in the delay until Monday but not the confirmation for today as no confirmation was made for today. We are assisting ViNGN to be ready for Monday.
'true leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation."
On Nov 25. 2015. at 8:13 AM. Cecile de Jongh
wrote:
Email received from outside of the ATN domain. Use caution before using links/attachments.
Good morning Omar and Hector.
Has the date switched to Monday due to the fact that VINGN has not done the crossover? If so. why did Hector confirm today? Will VINGN complete the crossover by Monday?
On Nov 25. 2015. at 9:02 AM, Jermaine ca.
wrote:
Good day Omar
I am not understanding this. As per my conversation. I stated Monday is too long. I started receiving emails from Hector concerning the installation shortly after. One of my last email was
confirming tomorrow.
Jruan
From: Omar Welch a
Sent Wednesday. November 25.2015 8:55 AM
To: Jermane
Cc: Hector Citron: Cece de Jongh
Subject: Re: fiber project
Jermaine per my message Hector will not be able to complete installation until Monday please make arrangements for this. Also we are still awaiting confirmation from VINGN on the cross
connect.
"True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation."
On Nov 24. 2015. at 3:32 PM. Jermaine <la
wrote:
Email received from outside of the ATN domain. Use caution before using links/attachments.
Good Day Hector,
Please be advised, all components are here in the office ready for installation tomorrow. Does VINGN have the crossover in place?
Regards
Jruan
From: Hector Clntron (maitta
Sent: Tuesday. November 24, 2015 12:28 PM
To: Jermaine Ruan
Cc: Omar Weld.,
Subject: RE: ter project
Hi Jermaine.
Can you send me a list of the items you have for the install? I want to make sure we have everything before I head over there.
Thanks.
From: Hector CIntron
Sent: Wednesday. November 11.2015 10:47
To: 'Jermaine Ruan'
Cc: Omar Weld.,
Subject: RE: feet project
I cannot give you a date sense it's all based on the following:
?
ViNGN installs the cross conned
?
whether we order the parts or LSJ order the parts. This was something that Omar was going to speak to (sorry I do not know the name) LSJ Finance.
o For ViNGN connection (Router Module. Fiber Module. Fiber cable)
o Choice connection (switches. fiber cables)
Also just an FYI I'll be going on vacation staring this Friday and I'll be back on Monday 2P so assuming all the above is installed. purchased and delivered by the time I get back it would be
sometime the week of the 2361
Hector.
From: Jermaine Ruan
Sent: Wednesday. November 11. 2015 09:52
To: Hector ciroron
Cc: Omar Welch
Subject: Re: Peer project
Email received from outside of the ATN domain. Use caution before using linksrattachments.
Good morning gentlemen
The principal is requesting a new date for the fiber. Do you have a suggested estimated lime of completion?
EFTA01139443
Regards
Jruan
Good evening all
When is the new dale for the connection so I can update my superiors
Regards
Jruan
Sent from my iPhone
On Nov 10. 2015. at 11:25 PM. Hector Cintron .L:
> wrote:
Hi Guys.
I haven't received notifications that the items that we need to finish came in so that would be no.
From: Omar Welch
Sent: Tuesday. November 10. 2015 19:06
To: Jermaine Ruan: Hector Cintron
Subject: Re: fiber propel
Hector?
'True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation."
On Nov 10. 2015. at 6:44 PM. Jerrnaine Ruan
wrote:
Email received from outside of the ATN domain. Use caution before using linksfattachments.
Good night Omer
Yep. I am trying to line up the runs in the morning
Regards
Jruan
Sent from my iPhone
On Nov 10. 2015. at 6:19 PM. Omar Welch
wrote:
To come to the island?
'True leaders fortify themselves with thinkers and innovators. because yes men are only saying yes to self preservation."
On Nov 10. 2015. at 6:10 PM. Jermaine
wrote:
Email received from outside of the ATN domain. Use caution before using linksfattachments.
Good day omar
Is hector still on for tomorrow?
Regards
Jruan
EFTA01139444
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Email
[email protected]Related Documents (6)
House OversightFinancial RecordNov 11, 2025
Jeffrey Epstein email chain discussing removal of Haiti NGO press release and solicitation of foundation funding for CEFOTAJ, SA
The passage reveals a direct request from a Haitian NGO to Epstein’s foundation for grant coordination, mentions a press release removal, and references President Obama’s ‘Hope’ legislation. While it Email dated June 22, 2012 from Jeffrey Epstein to a contact named ‘Unik’ about removing a press rele Forwarded request from Marlene Edme, founder/president of CEFOTAJ, SA, a Haitian NGO, seeking foun
1p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA02006683
0p
DOJ Data Set 10OtherUnknown
EFTA02037248
2p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01997332
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01794962
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01782219
0p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.