Case File
efta-efta01139445DOJ Data Set 9OtherFrom: Cecile dc Jongh
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01139445
Pages
6
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Cecile dc Jongh
To: Jeffrey Epstein ,:jeevacation(a)gmail.com>
Subject: Fw: fiher project
Date: Tue. OR Dec 2015 IR:00:17 +0000
Inline-Images: image001.jpg: imagc002.png
With warm regards.
Cecile
On Friday. December 4.2015 5:59 PM. Hector Cintmo •:
:• wrote:
Hi Everyone:
Eli send a full detail report in a few days. So far here is a brief description.
•
The Ruckus AP that is setup to cover the southside of the island that is installed on the tower where the Dragonwave is not working.
•
There was a network loop between the dragonwave and the netgear causing packet drops and unstable network. " Fixed
•
Install two switches (Outside shelter. Gym) to be able to monitor both the Dragonwave and Ruckus bridge
•
Took out the apple router that was working as DHCP and NAT.
•
Brought the Cisco 2921 router online. Now this is the main DHCP and NAT router
•
Installed the fiber cable and module for the ViNGN connection. This was installed in Port 5 on the fryer cable that goes to Vessum
•
I re-enable the dragonwave management ports so I can verify the configuration
•
I changed the password of both radios (the default password was configured Jermaine DI get you the new password so you can file them)
•
I added some of basic monitoring. For the dragonwave (I would be able to add full monitoring until I reconfigure the units)
•
I added monitoring to the cisco router and the switch in the shelter
We did some testing before we left with youtube and AppleTV and all were working without buffering.
The Dragonwave wit have to be taken offline once the ViNGN circuit goes online. The software on the unit is old and it has some bugs that wil cause issues once the units are up for about 1-2
months. The connection will drop until the unit is rebooted.
Another bug is this error.
Notice:Dec 01 21:55:01 C1N14DGM0075 alarm[544789-11: Critical: Crypto configuration mismatch peer /Morn cleared
Notice:Dec 01 21:55:01 C1N14DGM0075 alarm[544789-11: Critical: Crypto configuration mismatch peer /Morn raised
1957
MAIllettlfig laying) hey
to proper Key.
nulrrldfur
I
Crypto configuration mismatch alarm raised on new link or radio
1.01.00 I
1.02.05
swap even if encryption is not enabled on both radios.
170
!nowt. ennfinnratL-w• enicantrh elerme nnt eta arael Agana reran
1 Al NI
1 Al AC
Will send the rest of the info in the detail report
From: Jemmme Ruan (mailto
Sent: Friday. December 04 21.1
To: Omar Welch.
Hector Cintron
Cc:
Subject: Fwd: fiber project
Email received from outside of the ATN domain. Lisa caution before using imksrattachments.
Good day all.
Hector was able to complete the (Glowing:
- clear up the network loop that was causing bottle in data follow
- install the switches to monitor the dragonwaves
- physical setup for the new router for vingn
To be done:
-Wrign to do the physical acesover at stt
-create the tier login id's for dragchwaves
-setup for remote monitoring for island
Regards
-Oman
Sent from my Phone
Begin forwarded message:
From: Hector Cintrch
Date: Decanter 3.2015 at 7:19:30 PM MT
To: Jermame Rh
Cc: Omar Welch
eo
Subject: RE: fiber project
ei°^9h '
•AlYsfer Edwards
When I left the office I asked Allan and I didn't see the cables. he will be looking into it.
Also just an FYI I logged in the dragonwave to gather some information and I noticed that both Ethernet ports (data and management) on the LSJ side are plugged in to the switch creating a network
loop . What I did was shutdown the management port on outside. This will help some but will be fixed tomorrow. I would not be surprised that accessing the internal is smoother now due to
EFTA01139445
lowering of the packet drops and max times
Pings before shuting down the port
Success rate is 98 percent (9876110000). round-trip min/an/max = 1(41128 ms
After
Success rate is 99 percent (9999110000). round-trip min/an/max = 1(4144 ms
From: Jermaine Ruan jm81803.1.1
Sent: Thursday. December 0 .
To: Hector Contron
Cc: Omar Welch: Cede de Jongh: Alyster Edwards
Subject Re: fiber project
Email receNed from outside of the ATN amain. Use cauticn before using Mks/attachments.
HI Hector
Terrence stated that the login for dragonwaves we set to factory default .
Regards
Jruan
Sent from my iPhone
On Dec 3. 2015. at 3:52 PM. Hector Ontron
Hi Jermaine.
I just spoke with omar and the cable hasn't arrived. what we can do is this. Ill split the work on two trips.
go tomorrow weather permitting (it's supposed to be sunny) regardless if the VINGN
circuit is ready and
do the installation. I'll bring up the router and install the 2 switches to be able to monitor the dragonwave and I'll leave the deep inspection and testing for the second trip once
VINGN is up.
There will be a downtime of between 1 to 2 hours as I make the changes. If this is acceptable I'm a GO for tomorrow. What I'll need after the switch installation is the logins for the dragonwave so
once this is done I can start with the verification of the link (no changes will be made).
On the second trip I'll go to the island with Alyster takedown the dragonwave to do the following:
Test ViNGN circuit
Test ViNGN failover
Verify all grounding
Verify all connectors weatherproofing
Verify Lightning arrestors
Check all cables and replace cables if needed
Upgrade firmware on DW if needed
Make configuration changes to the DW if needed
Let me know if this is acceptable.
From: Jermaine
Sent: Wednesday. 0
To: Omar Welch
Cc: 'Cecile de Jonah': Alyster Edwards: Hector Canton
Subject: RE: fiber project
Email received from outside of the ATN domain. Use caution before uang links/attachments.
Good Evening Omar.
I am following up to verify that VINGN is on target for tomorrow and Choice for Friday.
Regards
Jruan
From: Hector Cintron jrnaJ1111.11M
Sent: Monday. November 30.
To: Jemmine Ruan
Cc: Cecile de Jongh: Omar Welch: /Water Edwards
Subject: RE: fiber project
Perfect. you got everything. The PDF only had the fiber from Power and Tel and not the items from curvature. so I just wanted to make sure.
Thanks
From: Jermaine Ruan jrasklgill
Sent: Monday. November 30.
To: Hector Gnaw
Cc: Cecile de Jongh: Omar Welch: Alyster Edwards
Subject: Re: flier project
Email received from outside of the ATN domain. Use caution before uang links/attachments.
Good day Hector
EFTA01139446
I have 2 simplex and 3 duplex cables from power and tel. I have 1 hwic module and 1 glc connector.
Lo5mage1.JPG
Sent from my &bone
On Nov 30. 2015. at 4:31 PM. Hector Cintron
wrote:
Those are the fiber cable from power and tel. was an order placed for the cutvature items?
Bellow I highlighted the items:
Green are the items from Power and Tel that arrived
Yellow are the items from Culvature that I do not see listed on the PDF
From: Jermaine mailto
Sent Monday. November 30.2015 16:24
To: Hector Cintron: 'Cecile de Jongh'
Cc: Omar Welch: Alyater Edwards
Subject RE: fiber project
Email received from outside of the ATN domain. Use caution before using links/attachments.
Please see attached
From: Hector Caton [ma
Sent Monday. November 30.201512:54 PM
To: Cede de Jongh
Cc: Omar Welch: Jenaaine:Alyster Edwards
Subject RE: fiber project
Jermaine.
Can you send me a list of all the items that you received? I want to make sure we have everything. I just created a BOM to keep track of what is needed and I'm sure I'll adding to the
work/pending list
OTY
part
desc
BOM
Installed
Location
arrived
Responsibility
1 CISCO2921/K9
Cisco Router
Data Room
Installed
Choice
1 GLC-BX-D
ViNGN Simplex Single Mode Module
In the data router
Data Room
LSJ
1
LinG14-Siinf)lex Cable 35 ST to [C
Between Cisco Router and Patch Panel (coming from STT)
Data Room
LSJ
1 HWICAGE-SFP_ WIC Card for SEP
Cisco Router
Data Room
LSJ
1
MM Duplex ftheriraSC to LC
Between Cisco Router and Patch Panel
Data Room
LSJ
1 GLC-SX-MM
MM Fiber Module
Cisco Router
Data Room
x
Choice
1 GLC-SX-MM
MM Fiber Module
Cisco 3560
Building - Gym
x
Choice
1
Between Cisco 3560 and patch Panel
Building - Gym
LSJ
4
rackmount screws
for Cisco 3560
Building - Gym
LSJ
1 3560G-24
Cisco 3560
Building - Gym
x
Choice
1 356OG-24
Cisco 3560
Outside Cabinet
x
Choice
4
rackmount screws
for Cisco 3560 Could use existing from nelgear
Outside Cabinet
LSJ
Other Pending Items/Work
Cross Connect
Router Config Info
Dragonwave Warrantee Info
I
STT Beach
ViNGN
LSJ
EFTA01139447
Dragonwave Survey
Includes Signal, Firmware, Hardware, Monitoring, Grounding
Choice
From: Cecile de Jongh Imei
Sent Wednesday. November .
To: Hector Cintron
Cc: Omar Welch: Jermaine
Subject Re: fiber project
Email received from outside of the ATN domain. Use caution before using links/attachments.
Thank you Hector.
On Nov 25. 2015. at 11:37 AM, Hector Cintron
wrote:
I can only comment about #3
3 — it should, this way I can do a fill integration of the ViNGN. Dragonwave backup. test failover.
The plan that I would like to do:
•
install ViNGN via the new router. Test it and switch the island over this new connection (primary)
•
Once this is done I can takedown the Dragonwave connection to add some switches to be able to monitor the link and take over maintenance. Once this is complete
•
Reconnect the Dragonwave as secondary link
•
Test failover to Secondary (DW).
The above plan has a 1-2 min downtime.
If ViNGN is not ready I can still do the install but I need to install the switches needed to monitor the dragonwave there will be a downtime of a few hours as I do the swap but no testing will be
done.
Hector.
From: Cecile de Jongh a
Sent Wednesday. November 25.2015 10:40
To: Hector Cintron
Cc: Omar Welch: Jermaine
Subject Re: fiber project
Email received from outside of the ATN domain. Use caution before using links/attachments.
Ok.
1. Does this still need to be scheduled with them?
2. II so. do we do that or do you?
3. Does this need to be done before Hector goes to the island or can it be done anytime afterwards?
On Nov 25, 2015. at 10:19AM. Hector Cintron
wrote:
The crossover does require a visit to the Pole (the one in St Thomas at the beach) where VINGN connects to the fiber the goes to the Island.
From: Cecile de Jongh
Sent Wednesday. November 25.2015 10.17
To: Omar Welch
Cc: Jermaine: Hector Cintron
Subject Re: fiber project
Email received from outside of the ATN domain. Use caution before using links/attachments.
Does this 'crossover require VINGN to visit the site or is it something that is done remotely from their office?
On Nov 25, 2015. at 10:01 AM. Omar Welch
wrote:
Hi Cecie
The connection does play a part in the delay until Monday but not the confirmation for today as no confirmation was made for today. We are assisting ViNGN to be ready for Monday.
'True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation.'
On Nov 25, 2015. at 8:13 AM, Cecile de Jongh
wrote:
Email received from outside of the ATN domain. Use caution before using links/attachments.
Good morning Omar and Hector.
Has the date switched to Monday due to the fact that VINGN has not done the crossover? If so. why did Hector confirm today? Will VINGN complete the crossover by Monday?
On Nov 25, 2015, at 9:02 AM. Jermaine <
Pl"rote:
Good day Omar
I am not understanding this. As per my conversation. I stated Monday is too long. I started receiving emails from Hector concerning the installation shortly after. One of my last email was
confirming tomorrow.
Jruan
EFTA01139448
From: Omar Welch
Sent: Wednesday. Novem
.
To: Jean/rine
Cc: Hector Cintrcn: Cece de Jongh
Subject: Re: fCe project
Jermaine per my message Hector will not be able to complete installation until Monday please make arrangements for this. Also we are still awaiting confirmation from VINGN on the cross
connect.
'True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation."
On Nov 24, 2015, at 3:32 PM, Jermaine .r
wrote:
Email received from outside of the ATN domain. Use caution before using links/attachments.
Good Day Hector.
Please be advised. all components are here in the office ready for installation tomorrow. Does VINGN have the crossover in place?
Regards
Jruan
From: Hector Contron [medic.
Sent: Tuesday. November 24. 2015 12:28 PM
To: Jermane Ruan
Cc: Omar Welch
Subject RE. fiber project
Hi Jerrnaine.
Can you send me a list of the items you have for the install? I want to make sure we have everything before I head over there.
Thanks.
From: Hector Canyon
Sent: Wednesday. November 11. 201510:17
To: *Jermaine Ruan'
Cc: Omar Welch
Subject RE: fiber project
I cannot give you a date sense it's all based on the following:
VINGN installs the cross connect
?
whether we order the parts or LSJ order the parts. This was something that Omar was going to speak to (sorry I do not know the name) LSJ Finance.
o For VINGN connection (Router Module. Fiber Module. Fiber cable)
o Choice connection (switches, fiber cables)
Also just an FYI I'll be going on vacation staling this Friday and I'll be back on Monday 20 so assuming all the above is installed. purchased and delivered by the time I get back it would be
somata-no the week of the 20
Hector.
From: Jermaine Ruan [mato
Sent: Wednesday.
No
To: Hector Cintron
Cc: Omar Welch
Subject Re: fiber project
Email received from outside of the ATN domain. Use caution before using links/attachments.
Good morning gentlemen
The principal is requesting a new date for the fiber. Do you have a suggested estimated time of completion?
Regards
Jruan
Good evening all
When is the new date for the connection so I can update my superiors
Regards
Jruan
Sent from my iPhone
On Nov 10. 2015. at 11:25 PM. Hector Cintron
wrote:
Hi Guys.
I haven't received notifications that the items that we need to finish came in so that would be no.
From: Omar Welch
Sent: Tuesday. November 10. 2015 10:06
To: Jerrnaine Ruan: Hector Contron
Subject: Re: fiber project
Hector?
EFTA01139449
'True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation."
On Nov 10, 2015. at 6:44 PM. Jermaine Ruan
wrote:
Email received from outside of the ATN domain. Use caution before using links/attachments.
Good night Omer
Yep. I am trying to line up the runs in the morning
Regards
Jruan
Sent from my iPhone
On Nov 10. 2015. at 6:19 PM. Omar Welch
wrote:
To come to the island?
"True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation."
On Nov 10. 2015. at 6:10 PM. Jermaine
wrote:
Email received from outside of the ATN domain. Use caution before using linkstattachments.
Good day ornar
Is hector still on for tomorrow?
Regards
Jruan
EFTA01139450
Technical Artifacts (3)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Domain
gmail.comPhone
(9876110000Phone
(9999110000Related Documents (6)
House OversightFinancial RecordNov 11, 2025
Jeffrey Epstein email chain discussing removal of Haiti NGO press release and solicitation of foundation funding for CEFOTAJ, SA
The passage reveals a direct request from a Haitian NGO to Epstein’s foundation for grant coordination, mentions a press release removal, and references President Obama’s ‘Hope’ legislation. While it Email dated June 22, 2012 from Jeffrey Epstein to a contact named ‘Unik’ about removing a press rele Forwarded request from Marlene Edme, founder/president of CEFOTAJ, SA, a Haitian NGO, seeking foun
1p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA02006683
0p
DOJ Data Set 10OtherUnknown
EFTA02037248
2p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01997332
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01794962
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01782219
0p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.