Skip to main content
Skip to content
Case File
efta-efta01203749DOJ Data Set 9Other

From: Richard Kahn

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01203749
Pages
5
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Richard Kahn To: "jeffrey E." Subject: Fwd: Quote for Big N/LSJ Barge Date: Wed, 15 Apr 2015 14:32:56 +0000 Attachments: LSJ BigN.pdf attached is preliminary quote for barge in the amount of 150,472 please note it has not addressed items 12-18 on our list Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 tel 212-971-1306 fax 646-350-0954 cel Begin forwarded message: Date: April 14, 2015 at 5:02:43 PM EDT From: gene kral Reply-To: gene kral To: Daphne Wallace Cc: Bill Hagu ann rodriquez < ano ljiggin Mary Kral u ject: Quote for Big NILSJ Barge e ra owry Good Afternoon All. Please see attached quote. Please send a list of all the individuals that should be included on any relevant emails to: Thank you, Gene Kral Sr. Subbase Drydock, Inc. Parcel 162, Subbase St. Thomas, USVI 00802 TEL: (340) 776-2078 FAX: (340) 779-8426 www.subbascdrydock.com Rich Kahn EFTA01203749 From: Daphne Wallace I To: gene kral Cc: Bill Hague Sent: Monday, April 13, 2015 4:01 PM Subject: Re: Barge List ann rodriquez Rich Kahn Greetings Gene, 10 am tomorrow morning to see Big N at the American Yacht Harbor marina is confirmed. If Anna has any changes she will contact you. Kind regards, Daphne On Mon, Apr 13, 2015 at 2:58 PM, gene kral I would like to visit Big N tomorrow around 10:00 a.m. ok? Gene Gene Kral Sr. Subbase Urydock, Inc. Parcel 162, Subbase St. Thomas, USVI 00802 TEL: (340) 776-2078 FAX: (340) 779.8426 wwwsubbasedrydock.com From: Bill Hague To: ann rodriquez Cc: Rich Kahn ay. pri :29 PM Subject: Re: Barge List Ok. 1 Rudders must be removed and the lower portion must be renewed to proper dimension. They are worn to the point of failure and vibrate badly. wrote: Daphne Wallace Gene Kral 2 We bought pumps and pulleys we can install but I am referencing the gear in the aft compartment that is the hydraulic actuator and linkage for the rudders 3 The cylinders were damaged at sea due to improper installation and subsequent damage from a broken fitting. The ramp was secured with a safety strap but still pulled the top sealing portion out of the cylinder. I discussed this with Roy and it was decided to weld solid the leaking and damaged portions rendering the cylinders unserviceable in the future but functional for the present. The fit of the mounts needs to be remedied at this time. The cylinders work now but are not repairable. Evaluation while being removed to correct and improve the mounting is necessary at a minimum. 4 EFTA01203750 The exhaust was assembled without funding to get the barge off the dick at the last haulout. It is not properly assembled or supports nor is it insulated. 6 We have new ones but need new mounting hoses And must be done out of the water 7 Bearings must be purchased. I think SBDD has them 8 Inspection and new sacrificial sinks installed. 9 SBDD should provide this but it can be discussed. 10 Machine shop work SBDD 12 This should be done at the same time the tank is cleaned. 13 Watertight compartments forward would need to be dewatered if breached. There is no ability to do so at this time except fit the first two compartments that are joins as one due to a hole in the bulkhead. 16 The gauges for oil and temp and rpm are not accurate. One over temperature alarm is not working as well. 18 Parts.... As needed by inspection. Sent from my iPhone On Apr 13, 2015, at 13:38, ann rodriquez wrote: Hey Roscoe, Please see questions ---? I need a clear understanding of the listed items, What parts should we purchase and What can be done in house. 1. Rudders. --- What should be done? 2. Steering Gear.----Did we buy the parts for this? 3. Hydraulic Cylinders. What need to be done? EFTA01203751 4. Exhaust system:--- What are the issues? 5. Engine Mounts and alignment. (Ok!) 6. Stuffing boxes/seals. Install new units:---- Should we buy the new units? 7. Cutlass bearings. ---- Do we need to purchase? 8. Engine Cooling Grid Coolers and Zinks. What need to be done? 9. Bottom Paint and Barrier Coat/ Hull Zinks. Should we purchase? 10. Engine and marine gear control bracket work. Do we need to purchase? 11. Fuel tank clean out. Port and starboard. (Ok!) 12. Starboard deck fuel fill adapter replacement. --- Should we replace or fix? 13. Bilge pumping system forward compartments. --- What about the forward compartments? 14. Repair existing 24 volt alternator and add a second one to port motor. ---- Should we purchase? 15. Inspect and size all hydraulic lines and fittings as needed. (Ok!) 16. Engine and marine gear instruments in control tower. ---- What does this mean? 17. Install engine room lighting. (Ok!) 18. Tune and service both engines and marine gear. ---- Any parts need? 19. Clean and paint engine room. ---- (Ok!) Ann R. DISCLAIMER: The information contained in this e-mail may be privileged,confidential, and protected from disclosure. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or duplication of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately and delete all copies. On Monday, April 13, 2015 12:22 PM, Boscoe wrote: The following is the list I discussed with Gene at Subbase Drydock today 4/13/2015. He is familiar with it and is now submitted for your review. Inspect and Repair the following; 1. Rudders. 2. Steering Gear. 3. Hydraulic Cylinders. 4. Exhaust system 5. Engine Mounts and alignment 6. Stuffing boxes/seals.. Install new units 7. Cutlass bearings 8. Engine Cooling Grid Coolers and Zinks 9. Bottom Paint and Barrier Coat/ Hull Zinks 10. Engine and marine gear control bracket work. 11. Fuel tank clean out. Port and starboard 12. Starboard deck fuel fill adapter replacement 13. Bilge pumping system forward compartments 14. Repair existing 24 volt alternator and add a second one to port motor. 15. Inspect and size all hydraulic lines and fittings as needed. 16. Engine and marine gear instruments in control tower 17. Install engine room lighting 18. Tune and service both engines and marine gear. 19. Clean and paint engine room. Timing of work I have been told this haul out must be done in late April or May as there is scheduled and contracted work reported for this facility during June, July and August. EFTA01203752 Please, respond with any questions you may have. EFTA01203753

Technical Artifacts (11)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domainwww.subbascdrydock.com
Domainwwwsubbasedrydock.com
FaxFAX: (340) 779-8426
FaxFAX: (340) 779.8426
Faxfax 646-350-0954
Phone(340) 776-2078
Phone(340) 779-8426
Phone(340) 779.8426
Phone212-971-1306
Phone646-350-0954
Wire Refreferencing

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.