Case File
efta-efta01912243DOJ Data Set 10CorrespondenceEFTA Document EFTA01912243
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01912243
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...
Extracted Text (OCR)
EFTA DisclosureText extracted via OCR from the original document. May contain errors from the scanning process.
loft,
ISJ
Project list
as of
1/3/2013
PRIORITIZE
PROJECT DESCRIBTION
ILabor4Hour Rat Labor Cost
Material cost
Estimated cost Start Date
End Date
Notes
Landscape
Seeds -Florida
Waiting on invoice for amount and type of seeds
Caribbean Plants with color
Ingrid -Change jasmine qty to 50 plants,100 bright red
bougainvillea to order, 3 gal.
Sea grape plants
1/8/2013 ingrid to work on order
Bougainvillea
Jasmine
Pops garden
Hire outside supervisor
To come over once of twice a week
Reorganize the tunnel
Dave projects
$
13,000.00
1
Staff bathrooms
$
9,500.00 $
9,500.00
12/28/2012
1/18/2013 MSI - bill $5,318.55 plus $4000 estimated fit out ( no list)
Porta potty
$
1,000.00 $
1,000.00
2
Pops garden
$
3,730.00 $
3,730.00
2/15/2013 MSI - $ 3730
Barge window frames
beach toy rack
$
1,000.00 $
1,000.00
Brice to provide material list - wood and hinges
2/9/2013
3
Planter boxes
1/10/2013 4 done 2 to go using materials on site
Barge chocks
Bronze sculpture gym
$
Propane Stand Tiki
$
Tunnel Lattice
$
Nap house and mangers cottage screens
$
4
Audio equipment kitchen
$
captains office AC frame
$
Dock boxes
$
EFTA_R1_00349473
EFTA01912243
2 oft,
ISJ
Project list
as of
1/3/2013
PRIORITIZE
PROJECT DESCRIBTION
ILabor4Houn Rat, Labor Cost
Material cost
Estimated cost Start Date
End Date
Notes
Priority Loading dock
Peter/ Landscape 3 days
Pool
Heater
Variable Speed Pump
Solar
Toshiba
Heating system for a pool
New meter • to determine line loss
Confirmed date w/ Toshiba
Solar battery and life in the salt air
Chiller Library
Cell Tower
1/2/2013
1/10/2013
1/12/2013
1/12/2013
Site visit of Jan 7.11 postponed
S
130,000.00
12 week lead Bid from Atlantic refrigeration (contact Kent)
alternate bids to be obtained to compare price
TBA
time
Metal Shed
Structure
S
43,140.00
1/18/2013
2/28/2013 Paid in advance Buck steal
Shipping and trucking
$
7,554.55
12/19/2012 On LS1
Fit out
6,500.00
Brice to provide material list from Danny
Tools
TBA
Accommodations
7,920.00
1/18/2013
1/29/2013
200/nt 3 units 11 nts plus @20%
Air
$
2,401.90
Paid in advance spirit
Food
TBA
Existing shed
Reskin
Fit Out lights
$
12,008.00
1/18/2013
2/28/2013
$
1,500.00
Cisterns
$
13,200.00
1/11/2013
1/30/2013 58,500 deposit paid
EFTA_R1_00349474
EFTA01912244
3 014
ISJ
Project list
as of
1/3/2013
PRIORITIZE
PROJECT DESCRIBTION
ILaborilHotm Rat Labor Cost
Material cost
Estimated cost Start Date
End Date
Notes
Movie Screen
$
15,500.00
Verbal quote from LV - written to follow
Roads
Solutions to surfacing
TBA
Gravel with a binding process as in temporary runways
Vehicles/Equipment/Boats
Kitchen audio system - purchase new receiver/DVD/Sub
Move to NY p
Ride on bagger mower
$
9,500.00
Brice to provide commercial Invoice
Routers/repeaters look into best giga hertz
Kawasaki Mules x3
$
33,000.00
Hold - do not pursue
Sell old engine estimate value $ 16K Number of HP pending
Repower Little C
$
50,000.00
twin 250 or twin 300
Kubota tractor
TBA
LV is using the golf cart for now and is ok with this
Internet service
Proposals for cell tower and repeater
Broadband VI - install service
299.00
$299 a month $3600 annually - per month
Barge
Maintenance
$
10,000.00
Windows need painting
Maintenance contract
Request proposal from Island Marine
Fuel Truck
Repair
$
9,800.00
Purchase
LV to get quotes on duel 5000 gallon truck (diesel/gasoline)
Danny Projects
E FTA_R 1_00 349475
EFTA01912245
4 014
ISJ
Project list
as of
1/3/2013
PRIORITIZE
PROJECT DESCRIBTION
Move lights on flag pole
Hot water heater - tiki house install
Chillax bathroom electrical
Labo Hour! Rat Labor Cost
Material cost
Estimated cost Start Date
End Date
Notes
NO cost
Fuel disposal
5
3,000 00
Punch - list items
Adjust black bike brakes
Fuel depot
Permit status
Quote on fuel pad
Bolke and fuel availability
Lease
Moorings
Request inspection from USCG
Submit all paperwork
DKI
Permit has been review and is awaiting Phillip Smiths
signature ( no Estimated
LV to discuss with Bolke
1/8/2013 Signed lease to be delivered on Tuesday
Dempsey had requested inspection - Hodge preparing letter
to DPNR(JP Oriel) and is completing army corp certification
form
FIRE SYSTEM
EFTA_R1_00349476
EFTA01912246
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.