Skip to main content
Skip to content
Case File
efta-efta01912247DOJ Data Set 10Correspondence

EFTA Document EFTA01912247

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01912247
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Zona Project list os of 1/3/2013 PRIORITIZE PROJECT DESCRIBTION Laborers Hours Rate Labor Cost Material cost Estimated cost Start Date End Date I Notes Landscaping Main house refurbishment $ 50,000.00 Replace Ponderosa pines $ 59,170.00 Terraces 52,000.00 3/25/2013 Gutter Stucco Telcomm/Data Fiber/Data option 1- ITC $ 137,121.14 Bids to be refined - Rich to conference with b Fiber/Data option 2 • Richard $ 111,773.27 Phones main house $ 30.99540 .Bids on review new system needed - current ; Mechanical upgrades Brice to forward bids Cooling tower replacement $ 17,032.08 JCH did pumps Stainless steel option 5,168.00 Do not take option Pool pak replacement Unit cost- dehumidifiers in swimming pool area $ 43,170.00 M Henderson Engineering $ 6,000.00 Other cost $ 5,000.00 HAVAC control system Needs upgrade Tools Audio/TV upgrades Western Systems estimated with options. $ 125,000.00 Proposal Vehides/EquIpment Purchase new suburban LV to get quote Brush Hog Well Fully on line with Well -K waiting to hear — .pernut should be finahnd by the end of dus work or Roof I I I I Continue to maintain Fountain - determine cause of leak Paris upgrade I of EFTA_R1_00349477 EFTA01912247 Zorn) Project list os of 1/3/20.13 ce toda' one 4C EFTA_R1_00349478 EFTA01912248

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.