Skip to main content
Skip to content
Case File
efta-efta02021854DOJ Data Set 10Correspondence

EFTA Document EFTA02021854

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta02021854
Pages
0
Persons
0
Integrity
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Sent Thur 7/12/2012 6:33:46 PM Subject FW: 9 E 71st St, Entry Estimate 1907.pdf om]; Jeffrey Epsteinheevacation©gmail.com]; Mr Epstein here is a quote for just the electrical installation part of the of the entrance hall lighting project , this contractor shows light fixtures at $300.00 each and for cost of the fixtures & installation at $6.619.00 no ceiling repair painting included. The first proposal from a general contractor has the budget light fixtures at 600.00 each x 8 lights =$4800.00 total cost $14.730.00 for turn key installation. To: Subject. 9 E 71st St Ent Estimate From: Date: Wed, 11 Jul 2012 09:28:42 -0400 Rich, Please see the attachment Pat Laredo Electric Inc F EFTA_R1_00527850 EFTA02021854

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domaingmail.com

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.