Skip to main content
Skip to content
Case File
efta-efta02021855DOJ Data Set 10Correspondence

EFTA Document EFTA02021855

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta02021855
Pages
0
Persons
0
Integrity
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: jeevacationegmail.comUeevacation©gmail.con brice gordon Cc: jeevacation©gmall.conteevacation©gmail.com) From: Bill Hague Sent Thur 7/19/2012 4:03:05 PM Subject Re: Big N I'm working on some of the issues as I type this. Assuming its decided to do the pre-sale repairs... Haul and launch Boat. $1250 Laydays. $ 250 each Remove propellers, propeller shafts, stuffing boxes, lower rudders and inspect steering gear. Reinstall. $5000 Necessary repairs to be quoted after discovery. Pressure wash bottom for paint. $300 Sand and paint bottom $2500 14 gallons of paint at $276 cash... per gallon. $3864 ( I am trying to negotiate a better price) As for other issues.. This list can be accomplished "in house" and in the water and whenever convenient for or desired by, the Principal. Fuel tanks cleaned Electrical repairs Cargo bay drains that leak Deck damage from concrete tanker incidents Deteriorated hydraulic fittings and hoses Topside paint Engine room covers and control tower supports that we're cut to install new motors New control cables Hydraulic drive flexible disk replacement I'll work on prices for the in house material list today. It should be noted that if it is decided to keep the barge .... The hydraulic cylinder rams should EFTA_R1_00527853 EFTA02021855 be replaced as they are rust pitted. This pitting is what caused the ram seals to leak as they are now... On Jul 19, 2012, at 10:37, "brice gordon" <[email protected]> wrote: Haul out? if we where to keep barge what other work would need to be done and at what cost On Thu, Jul 19, 2012 at 9:00 AM, Monique Harry <[email protected]> wrote: Good Morning, Attached per (Bosco) "Big N" Pre-Sale functional repair estimate. MON/QUE HARRY Project Administrator ISJ, 1411-C 6100 Red Hook Qtr Suite B3 St. Thomas USVI 00802 Tele hone Fax Brice Gordon Little Saint James USVI Phone: EFTA_R1_00527854 EFTA02021856

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.